Case Study: Plant Upgrade And Relocation

forex kostnad växla PPM were contracted to project manage a plant upgrade, including relocation of two metal coil processing lines from a nearby facility.

watch The line relocations were for a coil slitting line and a high speed shear line. These lines were originally installed in the 1980’s. These lines had some safety enhancements during their life but did not meet all of the client’s high safety standards.  As such, PPM were tasked with the design and implementation of upgrades to Safe Access systems including new safety PLC, new equipment guarding and electrical equipment and wiring upgrades. The high speed shear line also underwent drives replacement, which PPM was responsible for integrating into the overall upgrade project.

binäre optionen software Other plant upgrade works included in the project management scope:

  • manufacture and installation of new coil transfer cassettes and relocation of existing units
  • Installation of 2 rotating hookblocks and a coil lifting magnet to EOT cranes
     
  • Redundant equipment removal and building remediation.