Case Study: Plant Upgrade And Relocation

traiding binario PPM were contracted to project manage a plant upgrade, including relocation of two metal coil processing lines from a nearby facility.

opzioni binarie economia

opleiding binaire opties The line relocations were for a coil slitting line and a high speed shear line. These lines were originally installed in the 1980’s. These lines had some safety enhancements during their life but did not meet all of the client’s high safety standards.  As such, PPM were tasked with the design and implementation of upgrades to Safe Access systems including new safety PLC, new equipment guarding and electrical equipment and wiring upgrades. The high speed shear line also underwent drives replacement, which PPM was responsible for integrating into the overall upgrade project.

فوركس الدولار

köp Viagra på nätet Ängelholm (Helsingborg), Sverige Other plant upgrade works included in the project management scope:

http://teen-spanking.com/?popka=invertir-en-oro-opciones-binarias invertir en oro opciones binarias
  • manufacture and installation of new coil transfer cassettes and relocation of existing units
  • Installation of 2 rotating hookblocks and a coil lifting magnet to EOT cranes köp Sildenafil Citrate  
  • Redundant equipment removal and building remediation.