Case Study: Bulk Backer

traiding binario This project involved the duplication of a Bulk Paint Storage Facility at a coated steel paint line. PPM’s scope included the estimation and capital submission for project approval.  Following approval PPM became responsible for all aspects including design, procurement, management and commissioning of mechanical, electrical and process design and equipment. The scope included a 20,000 litre paint storage tank (pressure vessel), air and electric diaphragm pumps, pressure pipe work, lagging, electrics including instrumentation and automation.

opzioni binarie economia

opleiding binaire opties  

فوركس الدولار

köp Viagra på nätet Ängelholm (Helsingborg), Sverige The bulk backer facility was installed adjacent to an existing operating Bulk Primer facility which is classified as a Hazardous zone. All installation work was carried out with no unscheduled interruption to the operating plant while adhering to requirements of an operating Hazardous zoned plant. All pipework was stainless steel pressure piping. All installation work was tendered and a large amount of the work completed by local contractors.

http://teen-spanking.com/?popka=invertir-en-oro-opciones-binarias invertir en oro opciones binarias  

besser wie anyoption The project was successfully completed below budget and delivered to the tight schedule of less than 6 months between authorisation and commissioning.

optinbit