Case Study: Coal Dryer Facility - Redesign And Re-Commissioning Study

forex kostnad växla The intended purpose of the Coal Dryer is to dry coal fines. Dryer coal would allow a higher quality coke to be produced in the Coke Ovens process, which in turn would generate better productivity in the Blast Furnaces. Despite several attempts the Coal Dryer was not able to be successfully commissioned due a number of fundamental issues with the original design.

http://chslapuma.com/?jiosker=soldi-gratis&126=2d

watch The client engaged the services of PPM to provide specialist advice on whether the Dryer could be redesigned, re-commissioned, operated and maintained effectively and safely. In conjunction with an engineering company, PPM set about redesigning the process to achieve the original objectives.

go site